翻訳と辞書
Words near each other
・ Wallum froglet
・ Wallum Lake
・ Wallum sedge frog
・ Wallumatta
・ Wallumbilla Formation
・ Wallumbilla railway station
・ Wallumbilla, Queensland
・ Wallumettagal
・ Wallunarahu
・ Wallville, Maryland
・ Wallville, Oklahoma
・ Wallwa Qhata
・ Wallwasher
・ Wallwitz
・ Wallwork
WALLY
・ Wally
・ Wally (album)
・ Wally (anonymous)
・ Wally (band)
・ Wally (Dilbert)
・ Wally (given name)
・ Wally (Wallabies mascot)
・ Wally A. Forsberg
・ Wally Akers
・ Wally Albright
・ Wally Amos
・ Wally and Osborne
・ Wally Andersen
・ Wally Anderzunas


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

WALLY : ウィキペディア英語版
WALLY

WALLY (the WashtenawLivingston Rail Line) is a proposed commuter rail service which would link the Michigan cities of Ann Arbor and Howell.
== Proposal ==
Trains would run daily over existing trackage owned by the Great Lakes Central Railroad, which has also committed to providing ten stainless-steel bi-level passenger cars. The service is proposed as an alternative to adding a third lane to U.S. Highway 23 (US 23), which would cost upwards of $500 million. The Ann Arbor Area Transportation Authority is the "designated authority" for the project.
Initial start-up costs were projected at $2.9 million, with annual operating costs at $4.8 million. Backers of the project estimate 884,000 riders per year, with a fare revenue of $2.4 million. The remainder would be subsidized by state and local governments.〔 The project has received funding commitments from the Michigan Department of Transportation, the Ann Arbor Downtown Development Authority, and the Northfield Township Downtown Development Authority. Attempts to obtain a $1 million grant from the Federal government fell through. Both the University of Michigan and the Ann Arbor offices of the Environmental Protection Agency would pay the fares of any employees who took the train in lieu of commuting.〔 Backers conducted a $150,000 feasibility study of the line, with money pledged by the University of Michigan, the Great Lakes Central Railroad, the Southeast Michigan Council of Governments (SEMCOG), Washtenaw and Livingston Counties. The study reported back that the project is viable, but placed start-up costs at $32.4 million, much higher than initial estimates. Most of the outlay would be for infrastructure improvements. After three years of service the line would become eligible for federal transportation funding.
In April 2010 supporters announced a scaled-back proposal with start-up costs of $16–$20 million, with yearly operating costs of $7.1 million. As of September 2011, $16 million had been spent on capital costs with another projected $19 million required for startup, and operating costs were projected as an annual $5.4 million. In his oral update to the AATA board on January 19, 2012, AATA CEO Michael Ford reported on WALLY, the north-south commuter rail project that would connect Howell and Ann Arbor. Ford stressed that it’s currently not a viable project without the TIGER III funding that had been hoped for (but not received).
In October 2014, a new study into commuter rail service began. Expected to take about 18 months, it will focus on more detailed operational aspects of possible service than the 2008 study, including ridership, costs, station and maintenance locations, and funding.〔 It will also examine possible alternatives to rail service, such as busses or additional highway lanes.〔 The study is funded primarily through a Transportation and Community System Preservation grant, jointly administered by the Federal Highway Administration and the Federal Transit Administration, as well as a 20% match from the Ann Arbor Area Transportation Authority.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「WALLY」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.